GENERAL CONTRACTOR

GC Sample · San Jose Pace Center

Bid summary plus the complete detailed-estimate workbook rendered in public-view pages.

Request GC Estimate

Bid Summary

Source: GC Sample(4).xlsx. The supplied bid summary reports 16,060 GSF, projected cost of $4,586,714.31 and a suggested bid of $6,355,342.90.

BUILDING GSF16,060
PROJECTED COST$4.59M
SUGGESTED BID$6.36M
SCOPEGC
GC bid summary
FULL DETAILED ESTIMATE
GC detailed estimate page 1
GC detailed estimate page 2
GC detailed estimate page 3
GC detailed estimate page 4
ELECTRICAL

Electrical Estimate · Royal Crown Bakery

Source workbook: Electrical Estimate Client(1).xlsx. The estimate includes quantity, wastage, material, labor and total-cost fields.

Request Electrical Estimate

Workbook Preview

Project: Royal Crown Bakery. Labor rate shown in the supplied workbook: $80. The first major line is 1-1/4" EMT Conduit with 17 LF and 10% wastage.

PROJECTRoyal Crown Bakery
LABOR RATE$80
FIRST LINE17 LF
WASTAGE10%
Electrical estimate
ItemDescriptionQtyWasteQty w/WasteUnitMaterialLaborTotal
011-1/4" EMT Conduit1710%18.7LF$47.56$70.31$117.87
1-1/4" CONN COMP STL - EMT20%2EA$17.27$29.12$46.39
1-1/4" COUPLING COMP STL - EMT20%2EA$18.24$22.40$40.64
1-1/4" BUSHING - PLASTIC20%2EA$1.05$6.24$7.29
024" EMT Conduit1110%12.1LF$115.32$132.62$247.94
FULL ELECTRICAL WORKBOOK
Full electrical estimate workbook
PLUMBING

Plumbing Estimate · River North Block C

Common Area and Dwelling Unit worksheets from the supplied Plumbing Estimate Smith workbook.

Request Plumbing Estimate

Estimate Structure

Project location in the source workbook is Nashville, TN. Labor rate shown is $35. The workbook contains Common Area and Dwelling Unit estimating.

PROJECTRiver North Block C
LOCATIONNashville, TN
LABOR RATE$35
WORKSHEETS2
Plumbing common area estimate
COMMON AREA
Plumbing common area
DWELLING UNIT
Plumbing dwelling unit
HVAC

H.R. Crawford Gardens · HVAC Estimate

HVAC estimate and dedicated duct takeoff workbook pages, including flexible duct and air-device quantities.

Request HVAC Estimate

Estimate / Duct Takeoff

The supplied workbook contains an HVAC Estimate sheet plus a Duct Takeoff sheet for H.R. Crawford Gardens in Washington, DC.

PROJECTH.R. Crawford Gardens
LOCATIONWashington, DC
LABOR RATE$70
TAKEOFFDuct + Air Devices
HVAC duct takeoff
FULL HVAC ESTIMATE
HVAC estimate page 1
HVAC estimate page 2
HVAC estimate page 3
DUCT TAKEOFF
HVAC duct takeoff
MATERIAL TAKEOFF

Material Quantity & RFQ Schedule

Material Pricing, Conversion Factors and Bid Summary workbook from the supplied redacted sample.

Request Material Takeoff

Supplier Pricing Structure

The workbook includes take-off quantity, purchase quantity, unit, unit price, extended price and vendor-notes fields.

PRIMARY TABMaterial Pricing
CONVERSION TABConversion Factors
BID TABBid Summary
FIRST PACKAGESheetrock & Sealant
Material pricing schedule
MATERIAL PRICING
Material pricing schedule
BID SUMMARY
Material bid summary
DRYWALL / BOQ

Redacted Drywall Estimate

Pricing summary and detailed estimate BOQ from the supplied redacted drywall workbook.

Request Drywall Estimate

Pricing Summary + Detailed BOQ

The workbook includes finish categories such as Sheetrock and Sealant, Walls Framings, Insulation, GWB Ceiling, ACT Ceiling, Wall Panels and Weather Barrier.

SUMMARY TABPricing Summary
BOQ TABDetailed Estimate BOQ
STATUSREV(0)
FORMATDetailed BOQ
Drywall pricing summary
PRICING SUMMARY
Drywall pricing summary
DETAILED ESTIMATE BOQ
Detailed drywall BOQ
PROJECT ESTIMATE

Stella's Ice Cream Shop

Construction cost estimate with material cost, labor cost, subtotal, overhead and profit, and proposed project amount.

Request Project Estimate

Construction Cost Estimate Breakdown

The supplied workbook reports total material cost of $121,610.31, total labor cost of $123,797.11, and proposed project amount of $270,593.58.

MATERIAL$121.6K
LABOR$123.8K
PROPOSED$270.6K
MANHOURS163.6
Stella's Ice Cream Shop estimate
FULL ESTIMATE WORKBOOK
Stella's Ice Cream Shop estimate workbook
MULTI-SCOPE PROJECT

Tropical Haven

Five workbook tabs covering bath house, outdoor kitchen + sport court, pool + spa, site and entry monument scopes.

Request Similar Estimate

Multi-Scope Cost Breakdown

The supplied workbook contains five separate estimating areas with proposed project amounts of $405,039.42, $69,595.48, $463,239.03, $5,526,616.46 and $34,259.10 respectively.

WORKSHEETS5
PRIMARY TYPEG.C. Full
HIGHEST SCOPESite
SAMPLETropical Haven
Tropical Haven estimate
ALL FIVE WORKSHEETS
Tropical Haven bath house and pool storage room
Tropical Haven outdoor kitchen and sport court
Tropical Haven pool and spa
Tropical Haven site estimate
Tropical Haven entry monument
PLAN / TAKEOFF

Harris County Sheriff’s Office Site

Full plan-set source material and marked plan set for landscape / irrigation takeoff review.

Request Plan Takeoff

Plan + Estimate Reference

The supplied plan source identifies an irrigation plan, construction documents / issue for GMP status, sheet L3.01, and supported irrigation quantities. The estimate source reports a site estimate of $2,033,230.

ESTIMATE$2,033,230
PLAN SHEETL3.01
STATUSIssue for GMP
SCOPELandscape + Irrigation
Harris County Sheriff site estimate
Takeoff ItemQuantityUnit
Class 200 PVC Lateral Pipe605.784ft
Class 200 PVC Main Line Pipe1,548.290ft
Hunter PGP Ultra20Count
Hunter Pro-Spray64Count
Netafim Drip Tube3,238.0sf
Temp Irrigation20,445.1sf
SOURCE ESTIMATE · 7 PAGES
Source estimate page 1
Source estimate page 2
Source estimate page 3
Source estimate page 4
Source estimate page 5
Source estimate page 6
Source estimate page 7
MARKED PLAN SET · 2 PAGES
Marked plan page 1
Marked plan page 2